ELI PARK Bucharest 3 is an industrial park planned, which will be built in three phases, with a total area of 68,000 square meters expected. The first phase was developed in 2021 with an area of 18,000 square meters. The second phase is represented by an area of 30,000 square meters with a completion date of 2022. For the third phase, 20,000 square meters are planned.
Loading 3D assets, please don’t close the page
0%Hide
energy
features
building
green areas
parking
Floor load: uniform spread load of 6 tons/sqm, surface hardened by quartz application
24 x 12 m structural grid, concrete columns and beams
12 m internal clear height
Air heaters with direct gas fired heating system to maintain min. 12° C in warehouse at -15° C exterior
Natural light
ESFR sprinkler system, interior and exterior fire hydrants, fire and smoke detection system according to local regulation
LED lighting:
Warehouse standard lighting: 250 lux
Office area standard lighting: 500 lux
Roof insulation: 140 mm mineral wool
External wall insulation: 100 mm PIR
Flexible extensions options
Under Construction & Fully Leased
ELI PARK Bucharest NW is located in the northen part of the city, along the national road DN7.
It has good connections with other european cities, such as Budapesta, Hungary (834 km), and Ruse, Bulgaria (84 km), and with other major cities such as Constanta (252 km) or Ploiesti (80 km).I'll help you find your space